3W*1 LED Downlight, 110lm/W, >50,000 Hours Lifespan, 85-265V AC or 12-24V DC, >0.95 Power Factor, CE

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-18 15:41

  • Browse the number:

    70

Send an inquiries
Company Profile
Shenzhen Runray Electronic Co. Ltd
Contactaixin:

runray(Ms.)  

telephone:

(86 755) 23006990 Ext:888

Arrea:

Beijing

Address:

3/F,Block C, Wanda Industrial Park, Zhoushi road,Langxin Community, Shiyan,Bao’an District, Shenzhen, Guangdong, China (518000)

Website:

http://runray.bromleyenergysurveyors.com/

Product details

Model Number: Ray-3WMR16-RB0325 Brand Name: Runray Key Specifications/Special Features: Main features:Power: 3WVoltage: 85-265V AC or 12-24V DCMaterial: aluminumSize: 130*130mm
  • Cut hole size: 105*105mm
  • Lifespan: >50,000 hours
  • Color rendering index: >75Ra
  • Power factor: >0.95
  • Beam angle: 30°
  • LED chip: Epileds/Epistar/Bridgelux
  • Lumen efficiency: 80-110lm/W
  • Color temperature:
    • Warm white: 2,700-3,200K
    • Daylight white: 3,500-5,000K
    • White: 5,500-7,000K
    • Cool white: 8,000-10,000K
  • Certificate: CE
  • Applications:
    • Landscape accent/architectural lighting/artwork lighting
    • Schools/universities/hospital landscape accent
    • Conference/meeting rooms, show rooms
    • Commercial complexes
    • Residential/institution buildings
    • Amusement park accent
  • Our service:
    • Inquiry related to products or prices will be replied in 24 hours
    • Protection of sales area, ideas of design and all private information
    • Well-trained and experienced staffs to answer all inquiries in fluent English
    • Distributorship are offered for unique design and some current models
    • OEM and ODM, customized design of labels, packing and lamps are available
  • Cautions:
    • Switch-off power before replacing lamp
    • Power supply should be adapted to right voltage before installation
    • Keep away from direct sunlight and high-temperature
    • If any doubt about installation or use of this products consult a professional
  • Shipping Information:
    • FOB Port: Shenzhen
    • Lead Time: 7 - 10 days
    Main Export Markets:
    • Western Europe